HCO Building GRADE A

44B Ly Thuong Kiet, Cua Nam Ward, Hanoi

HCO Building is a Grade A office building at 44B Ly Thuong Kiet, Cua Nam Ward, Hanoi. Indicative rent: $33 - $35 /SQM. Typical floor area: 580 sqm/floor. Scale: 18 stories above ground and 1 basement level.

Building specifications

InvestorCông ty TNHH S.A.S - CTAMAD
ManagementBuilding Owner
Building gradeGrade A
CertificationLEED, Green Mark
Completion year1998
Scale18 stories above ground and 1 basement level
Typical floor area580 sqm/floor
Ceiling height2.7 m
Air conditioningChiller central air conditioning system
Elevators05 Mitsubishi elevators
Backup power100% backup power generator
ParkingOne basement level for parking
Working hoursMonday - Friday: 8:00 AM - 6:00 PM, Saturday: 8:00 AM - 12:00 PM

Cost details

Rent$33 - $35 /SQM
Service charge7 USD/sqm/month
VAT10%
Motorcycle parking120,000 VND/vehicle/month
Car parking3,800,000 VND/vehicle/month
Cooling electricityIncluded in service charge
Minimum lease termMinimum 3-year lease
Deposit & payment3-month deposit - Quarterly payment
OvertimeNegotiable
Estimate office spaceSketch the right space range from headcount, working style, and growth plans.Estimate suitable space
Estimate lease costBring rent, service charge, VAT, lease term, and operating inputs into one practical budget view.Estimate lease budget
Estimate fit-out costSet an initial fit-out budget from the office area and expected investment level.Estimate fit-out budget

Available space

Use the information below as an initial guide before confirming the preferred space and commercial terms with the building.

GRES is reviewing suitable floor options for this building.

Displayed rent and terms are for an initial comparison. The final option depends on required area, lease term, move-in timing, and the building’s current commercial conditions.

Need the right space at HCO Building?

Share your area, move-in timing, and budget. GRES will check current availability and return options aligned with your brief.

Required areaMove-in timingBudget range

More information

Building Overview

HCO Building — Tổng quan / Giới thiệu

Officially operational since 1998 by S.A.S - CTAMAD Co., Ltd., HCO Building has firmly established its position as one of the first international-standard Grade A office buildings in the heart of the capital. Situated within a premium complex that includes the 5-star Meliá Hanoi hotel, the building features 18 stories above ground and 1 basement level, offering a typical floor plate of 580 sqm/floor. With a seamless integration of professional workspace and world-class hospitality services, this is a strategic destination for multinational corporations and major financial institutions.

Location and Connectivity

Located at 44B Ly Thuong Kiet, Cua Nam Ward, Hanoi, HCO Building enjoys an outstanding frontage in the administrative and diplomatic heart of the city. Ly Thuong Kiet Street is a backbone route connecting central ward, featuring spacious infrastructure with minimal traffic congestion and hosting numerous high-level government agencies.

  • Ly Thuong Kiet Axis: Directly connects to key arterial routes such as Hai Ba Trung, Quang Trung, Tran Hung Dao, and Ba Trieu, creating an exceptionally convenient inter-wardt business network.
  • Hoan Kiem Lake and Hanoi People's Committee: Only 5 to 10 minutes away, providing ideal conditions for diplomatic activities and working with state management agencies.
  • Noi Bai International Airport: Approximately 35 to 40 minutes via Vo Chi Cong Street and Nhat Tan Bridge, optimizing travel time for executives and foreign experts.
  • Surrounding Utility Ecosystem: Adjacent to the Supreme People's Procuracy, major commercial banks, high-end restaurants, and premium 5-star services from the neighboring Meliá Hotel.

Technical Specifications and Operations

The building is designed and operated according to the strict technical standards of international Grade A offices, ensuring optimal working efficiency for businesses.

HCO Building — Kỹ thuật / Vận hành / Tiện ích
  • Scale & Floor Plate: 18 stories above ground and 1 basement level; typical floor plate of 580 sqm/floor with a rectangular column-free design, maximizing usable area and allowing flexible department layouts.
  • Ceiling Height: Reaches a standard of 2.7 m, providing a spacious working environment and facilitating the installation of ceiling-mounted technical systems.
  • Elevator System: Equipped with 05 high-speed Mitsubishi elevators, minimizing waiting times during peak hours.
  • Air Conditioning System: Modern Chiller central air conditioning system, ensuring even cold air distribution and energy efficiency.
  • Backup Power: 100% backup power generator capacity, ensuring uninterrupted business operations during grid failures.
  • Parking Lot: One basement level and surrounding premises adequately meet the parking needs of cars and motorbikes for staff.
  • Standard Working Hours: Monday - Friday: 8:00 AM - 6:00 PM, Saturday: 8:00 AM - 12:00 PM.

Leasing Costs and Commercial Terms

The leasing policy at the building is highly competitive and transparent compared to other Grade A properties in the central business wardt.

HCO Building — Thương mại / Giá thuê / Phù hợp
  • Reference Rent: $33 - $35 /sqm/month (rates may vary depending on the leased area and signing time).
  • Service Charge: 7 USD/sqm/month.
  • VAT: 10%.
  • Motorbike Parking Fee: 120,000 VND/motorbike/month (limited free parking available based on leased area).
  • Car Parking Fee: 3,800,000 VND/car/month.
  • Electricity Consumption: Air conditioning electricity is included in the service charge; office electricity is billed based on actual meter readings.
  • Overtime Fee (OVT): Negotiable based on the specific operational needs of the tenant.
  • Minimum Lease Term: Minimum 3-year lease.
  • Deposit & Payment: 3-month deposit - Quarterly payment.

Suitable Tenant Profiles and Checks

With its prime location and 5-star services, HCO Building is the perfect fit for multinational corporations, financial institutions, investment funds, law firms, and large-scale technology enterprises looking to assert their brand prestige. When conducting a physical site survey, businesses should pay attention to the following key technical points:

  • Net Usable Area Efficiency: Carefully measure the net usable area versus the gross area to optimize desk layout density.
  • Parking Capacity: Confirm the number of free motorbike slots and the availability of car parking spaces for executives during peak hours.
  • Overtime Costs (OVT): Clearly negotiate the overtime fee calculation method if your business frequently works late or operates night shifts.
  • Central Air Conditioning: Inspect the operation of the Chiller system and the ability to adjust temperatures for individual working zones.

Advisory Conclusion

HCO Building stands as a symbol of professional operation and prestige in central Hanoi, delivering exceptional brand value to its tenants. To receive the latest vacant area updates, detailed cost sheets, and to schedule a physical tour, please contact GRES consultants.

Office space for lease at HCO Building

Address44B Ly Thuong Kiet, Cua Nam Ward, Hanoi
Building scale18 stories above ground and 1 basement level
Typical floor area580 sqm/floor
Indicative rent$33 - $35 /SQM
Contact098 197 85 08info@gres.vn

Location map

Nearby buildings (Cua Nam Ward)

Same-grade buildings Grade A

Related guides

Frequently asked questions

What can the LEED, Green Mark certification at HCO Building add beyond image?
HCO Building holds LEED, Green Mark. This can be useful for ESG reporting, supplier requirements and workplace commitments; confirm the certificate scope and validity so the business can use it with confidence.
What should a realistic budget for HCO Building include?
Indicative rent is $33 - $35 /SQM; service charge 7 USD/sqm/month; VAT 10%. Compare the full monthly occupancy cost for the exact area, especially if the team uses parking or works after hours.
How flexible is the typical floor at HCO Building for a tenant?
The typical floor is 580 sqm/floor. A requirement close to a full floor can give the tenant better control of access and layout. A smaller requirement should be checked for subdivision, shared access and usable area.
Will parking at HCO Building work for the team in practice?
The building provides one basement level for parking. Current fees: motorbike 120,000 VND/motorbike/month. Limited free parking available.; car 3,800,000 VND/car/month. If many staff drive, ask for the tenant allocation, waiting list, visitor access and hours in writing; a basement count alone does not show how many spaces the tenant will receive.
How can a site visit to HCO Building answer the real leasing questions?
Prioritise whether the floor can be divided as required, lift waiting time at peak hour, the tenant's actual parking allocation, after-hours access and charges, the certificate scope and validity. Bring the real team brief and ask for answers on the exact floor, so the visit leads to a decision rather than another general tour.
Is HCO Building suitable for teams with demanding IT or operating needs?
The building has chiller central air conditioning system; 100% backup power generator. For server rooms or specialist equipment, confirm the available electrical load, which circuits receive backup power, after-hours cooling and the approval path for upgrades.
Does HCO Building work for teams that stay late or work weekends?
The practical terms are building hours: Monday - Friday: 8:00 AM - 6:00 PM, Saturday: 8:00 AM - 12:00 PM; overtime: Negotiable; air-conditioning electricity: Included in service charge. Match these against the real work schedule before deciding, because repeated overtime and cooling costs can materially change the monthly budget.
What does the lift setup at HCO Building mean at peak times?
HCO Building has 05 Mitsubishi elevators across 18 stories above ground and 1 basement level. The specification is useful, but the real test is waiting time: visit around arrival or lunch time and check lift zoning, access control and goods movement.
Want to compare with HCO Building and similar buildings?GRES can send 3–5 nearby or same-grade options so you can review the shortlist before a site visit.
Get comparable options Call GRES