DMC Building GRADE C
535 Kim Ma, Giang Vo Ward, Hanoi
DMC Building is a Grade C office building at 535 Kim Ma, Giang Vo Ward, Hanoi. Indicative rent: $11 - $12 /SQM. Typical floor area: 1000 sqm/floor. Scale: Comprising 18 above-ground floors and 2 basements.





Building specifications
InvestorTAN LONG COMPANY LIMITED
ManagementBuilding Owner
Building gradeGrade C
Completion year2002
ScaleComprising 18 above-ground floors and 2 basements
Typical floor area1000 sqm/floor
Ceiling height2.7 m
Air conditioningCentral air conditioning system by Carrier
Elevators3 high-speed Sanyo elevators
Backup power100% backup power generator
Parking2 basement floors and surrounding areas of the building
Working hoursMonday - Friday: 8:00 AM - 6:00 PM, Saturday: 8:00 AM - 12:00 PM
Cost details
Rent$11 - $12 /SQM
Service charge5 USD/sqm/month
VAT10%
Motorcycle parking8 USD/vehicle/month
Car parking80 USD/vehicle/month
Cooling electricityIncluded in service charge
Minimum lease termMinimum 3-year lease
Deposit & payment3-month deposit - Quarterly payment
OvertimeNegotiable
Estimate office spaceSketch the right space range from headcount, working style, and growth plans.Estimate suitable space
Estimate lease costBring rent, service charge, VAT, lease term, and operating inputs into one practical budget view.Estimate lease budget
Estimate fit-out costSet an initial fit-out budget from the office area and expected investment level.Estimate fit-out budget
Available space
Use the information below as an initial guide before confirming the preferred space and commercial terms with the building.
GRES is reviewing suitable floor options for this building.
Displayed rent and terms are for an initial comparison. The final option depends on required area, lease term, move-in timing, and the building’s current commercial conditions.
Need the right space at DMC Building?
Share your area, move-in timing, and budget. GRES will check current availability and return options aligned with your brief.
Required areaMove-in timingBudget range
More information
Location map
Nearby buildings (Giang Vo Ward)
Same-grade buildings Grade C
Related guides
Frequently asked questions
Beyond rent, which costs matter at DMC Building?
Indicative rent is $11 - $12 /SQM; service charge 5 USD/sqm/month; VAT 10%. Compare the full monthly occupancy cost for the exact area, especially if the team uses parking or works after hours.
What kind of office plan suits the floor plate at DMC Building?
The typical floor is 1000 sqm/floor. The floor plate is relatively large, which can help a growing team keep departments together. If the requirement is smaller, check how the floor can be divided and how much shared space remains.
Will parking at DMC Building work for the team in practice?
The building provides 2 basement floors and surrounding areas of the building for parking. Current fees: motorbike 8 USD/motorbike/month; car 80 USD/car/month. If many staff drive, ask for the tenant allocation, waiting list, visitor access and hours in writing; a basement count alone does not show how many spaces the tenant will receive.
How much commitment should a tenant plan for at DMC Building?
The working terms are lease term: minimum 3-year lease; deposit and payment: 3-month deposit - Quarterly payment. Read them alongside rent-free time, escalation, handover, renewal and early exit, because those points shape cash flow as much as the headline rent.
What should the final offer for DMC Building contain before approval?
Ask for a dated offer tied to the exact floor and area, covering rent, service charge, VAT, parking, overtime, handover, lease length, escalation and incentives. That is the figure finance should compare—not the headline rent alone.
Is DMC Building suitable for teams with demanding IT or operating needs?
The building has central air conditioning system by Carrier; 100% backup power generator. For server rooms or specialist equipment, confirm the available electrical load, which circuits receive backup power, after-hours cooling and the approval path for upgrades.
What does the lift setup at DMC Building mean at peak times?
DMC Building has 3 high-speed Sanyo elevators across comprising 18 above-ground floors and 2 basements. The specification is useful, but the real test is waiting time: visit around arrival or lunch time and check lift zoning, access control and goods movement.
What should a tenant expect from the Grade C label at DMC Building?
DMC Building is positioned as Grade C. Use the grade to set initial expectations, then decide on the actual floor, total cost, lift and parking experience, operating rules and lease terms.
Want to compare with DMC Building and similar buildings?GRES can send 3–5 nearby or same-grade options so you can review the shortlist before a site visit.










